Alliant Energy
CCR RULE COMPLIANCE

Data and Information

Alliant Energy's CCR Rule Compliance Data and Information

Home Edgewater Surface Impoundment Operating Criteria

Please select from the options below.

  • Annual CCR Fugitive Dust Control Report - 2021
  • Periodic Inspection Report - December 2020
  • Annual CCR Fugitive Dust Control Report - 2020
  • Periodic Inspection Report - December 2019
  • Annual CCR Fugitive Dust Control Report - 2019
  • Annual CCR Fugitive Dust Control Report - 2018
  • Periodic Inspection Report - November 2018
  • Periodic Inspection Report - December 2017
  • Annual CCR Fugitive Dust Control Report- 2017
  • Periodic Inspection Report - December 2016
  • Annual CCR Fugitive Dust Control Report - 2016
  • Initial Inflow Design Flood Control System Plan - September 2016
  • Initial Periodic Inspection Report - January 2016
  • Fugitive Dust Plan - 2015
  • Privacy Policy
  • Interest-Based Ads
  • Terms and Conditions
  • Accessibility
  • Legal Disclaimer
  • Contact Us

Copyright © 2025 Alliant Energy Corp.