Alliant Energy
CCR RULE COMPLIANCE

Data and Information

Alliant Energy's CCR Rule Compliance Data and Information

Home Nelson Dewey Surface Impoundment Operating Criteria

Please select from the options below.

  • Annual CCR Fugitive Dust Control Report - 2019
  • Annual CCR Fugitive Dust Control Report - 2018
  • Initial Inflow Design Flood Control System Plan - WPDES Pond - April 2018
  • Periodic Inspection Report - December 2017
  • Annual CCR Fugitive Dust Control Report - 2017
  • Periodic Inspection Report - July 2017
  • Fugitive Dust Plan - 2017
  • Periodic Inspection Report - December 2016
  • Annual CCR Fugitive Dust Control Report - 2016
  • Initial Inflow Design Flood Control System Plan - September 2016
  • Inspection Report Remedy Documentation - 2016
  • Initial Periodic Inspection Report - January 2016
  • Fugitive Dust Plan - 2015
  • Privacy Policy
  • Interest-Based Ads
  • Terms and Conditions
  • Accessibility
  • Legal Disclaimer
  • Contact Us

Copyright © 2025 Alliant Energy Corp.